View Single Post
Staro 07.12.2019., 01:39   #33
Manuel Calavera
Premium
Moj komp
 
Manuel Calavera's Avatar
 
Datum registracije: Jul 2012
Lokacija: vk+
Postovi: 14,575
Citiraj:
Autor The Exiled Pregled postova
PoCjetimo se kak to izgleda kad Raja i Intel (1 - 2 - 3) stvarno imaju i hardver spreman. Na pragu 2020. pak imamo puno priče, bez konkretnog hardvera i popratnih detaljnih tehničkih osvrta.
Pa iz teksta je već očito da se radi o nekom dalekom proizvodu, čak i Xe gpu druge generacije:

Citiraj:
The first thing I would like to point out is that Raja specifically refers to this GPU as Xe HP instead of just Xe. This is because the early variants of Xe are not going to be as powerful and this is the HP or High Performance variant.
Citiraj:
Considering it usually takes 2 years for the design to end up on shelves (at a bare minimum) , it is unlikely we are going to be seeing this GPU before 2021. In fact, this also means that this GPU is going to be based on either 10nm or 7nm and could be impacted by delays in volume ramps for either node.
Tako da s te strane ništa nije sporno. Prve Xe će očito biti neki mainstream-budžet proizvod

Inače ovaj Rajin tweet neodoljivo podsjeća na onoga za Vegu, kad je napisao nešto tipa "da je napravljen veliki napredak", "it's alive" ili tako nešto, te izjavio da neće Vega tako skoro. I došla je negdje cca godinu dana nakon toga. Ovdje se isto recimo spominje 2021. No sad do ljeta bi trebali izbaciti nešto, samo ova ogromna HP očito nije ta
Manuel Calavera je offline   Reply With Quote