View Single Post
Staro 12.01.2023., 18:17   #5801
The Exiled
McG
Moj komp
 
The Exiled's Avatar
 
Datum registracije: Feb 2014
Lokacija: Varaždin
Postovi: 6,769
Po svemu sudeći Meteor Lake bude samo i isključivo mobilno izdanje, dok se desktop varijante otkazuju, a zamjena su Raptor Lake osvježeni modeli, dok ne stigne nešto (Arrow Lake) konkretno u 2024.
EDIT:
Citiraj:
Citiraj:
Toward the end of 2023, Intel plans to release the 14th Gen Meteor Lake processors. The chipmaker claims its 4nm process is ready for ramp, and Meteor Lake is on track as planned. Meteor Lake will be the first consumer CPU to feature a chiplet design with disaggregated dies for compute, graphics, and I/O. Each of them will be fabbed on a different process node: Compute tile on the Intel 4 node, graphics die on TSMC N5, and SoC die on the TSMC N6 node. Meteor Lake is a mobile-centric platform that will reduce the P-core count to improve battery life and power efficiency. The core architecture will be upgraded to Redwood Cove (P-core) and Crestmont (E-core). MTL was supposed to be the first desktop family to adopt the LGA1851 socket with 6 P-cores and 16 E-cores. However, rumors have claimed that the desktop platform has been canceled for unforeseeable reasons.

Arrow Lake will succeed Meteor Lake in 2024. Being part of the 14th Gen family, it’ll be socket compatible with Meteor Lake, allowing OEMs to upgrade their notebook designs easily. Seeing how the MTL-S desktop chips are in limbo, it’ll be a much-anticipated release on the DIY end. Unlike its predecessor, it will be geared towards high-performance desktop users with 8P and 16E cores. Arrow Lake’s compute tile will be manufactured on the 20A (2nm) node with GAA (RibbonFET) transistors and PowerVia backside power delivery. It’ll feature an advanced chiplet architecture with Foveros 3D stacking, wider inter-die bandwidth, and a potent graphics die fabbed on the TSMC 3nm or 4nm process.

Lunar Lake will follow Arrow Lake in 2025. Fabbed on the cutting-edge 1.8A (1.8nm) process node, it will radically change Intel’s client CPU architecture. Built from the ground up for mobility, it’ll prioritize power efficiency over performance. There’s a very good chance that it is the product of the Royal Cove project designed by Jim Keller and his team. Lunar Lake will feature new CPU, GPU, and VPU architectures for lower power consumption and all-day battery life. It is the result of a close collaboration with Microsoft and will fully leverage the advanced capabilities of Windows 11. You can expect a slew of new ultra-thin notebooks and convertibles based on the Lunar Lake family.
Izvor: Hardware Times
__________________
AMD Ryzen 7 Pro 4750G + Vega iGPU | be quiet! Pure Rock 2 Black | MSI B450 Tomahawk Max II | 32GB G.Skill DDR4-2666 Value | 256GB AData SX8200 Pro NVMe | 2x4TB WD Red Plus | Fractal Define 7 Compact | Corsair CX450M

Zadnje izmijenjeno od: The Exiled. 14.01.2023. u 18:15.
The Exiled je offline   Reply With Quote