View Single Post
Staro 11.12.2019., 08:22   #2930
The Exiled
McG
Moj komp
 
The Exiled's Avatar
 
Datum registracije: Feb 2014
Lokacija: Varaždin
Postovi: 6,763
Intel’s Manufacturing Roadmap from 2019 to 2029: Back Porting, 7nm, 5nm, 3nm, 2nm, and 1.4nm
Citiraj:
Intel expects to be on 2 year cadence with its manufacturing process node technology, starting with 10nm in 2019 and moving to 7nm EUV in 2021, then a fundamental new node in each of 2023, 2025, 2027, 2029. In between each process node, as Intel has stated before, there will be iterative + and ++ versions of each in order to extract performance from each process node. The only exception to this is 10nm, which is already on 10+, so we will see 10++ and 10+++ in 2020 and 2021 respectively. The interesting element to these slides is the mention of back porting. This is the ability for a chip to be designed with one process node in mind, but perhaps due to delays, can be remade on an older ‘++’ version of a process node in the same timeframe. Intel is going to allow a workflow such that any first gen 7nm design could be back ported to 10+++, any first gen 5nm design could be back ported to 7++, and so on. Beyond 2023, Intel is currently in the ‘path-finding’ and 'research' mode.
Izvor: AnandTech

Izgleda da je u Intelu i dalje sve po planu.
The Exiled je offline   Reply With Quote