18.11.2019., 12:00
|
#10
|
McG
Datum registracije: Feb 2014
Lokacija: Varaždin
Postovi: 7,052
|
Intel’s 2021 Exascale Vision in Aurora: Two Sapphire Rapids CPUs with Six Ponte Vecchio GPUs
Citiraj:
Despite initially being a ‘deliver by 2020’ project, Intel is now saying that Aurora will be delivered in 2021.
This means that Intel has to execute on the following:- Manufacturing at 10++ in sufficient yield with respect to cores/frequencies
- Manufacturing at 7nm for chiplets, both in yield and frequencies
- Transition through DDR3 to DDR4 (and DDR5?) in that time frame
- Transition through PCIe 3.0 to PCIe 4.0 and PCIe 5.0 in that time frame
- Release and detail its 2nd generation Optane DC Persistent Memory
- Provide an SDK to deal with all of the above
- Teach researchers to use it
Ultimately, based on what we know so far, Intel still has a lot of work to do to deliver this by 2021. At any rate, some of these technologies might not get in the hands of the rest of us until 2022.
|
Izvor: AnandTech
|
|
|